BD Contact
Mr Bharath: 8884425515

close× Call Us +91-80- 26799382

Home / Seismic failure of 1000L pressure vessel

CM Techno helps the customer in assessing the root cause of failure of product and solution to continue in operation
Requirement

Failure/opening in the cladding plate where the vessel is supported with leg. This equipment is installed in South Korea, suspected the failure is due to seismic condition.

Solution

The root cause of this failure study was carried out by CM Techno and found the reason for this failure due to seismic loading through FE analysis – seismic study approach.

Benefits
  • Quick understanding of root cause of failure
  • Strengthen process by FE approach
  • Quick fixing the issue and resume to operation